Rdl 12016

Law 34/2007

One of the most ambitious actions implemented within the European Union for the application of the principle of prevention in the operation of the most polluting industrial facilities was the approval of Council Directive 96/61/EC, of September 24, on integrated pollution prevention and control, which established measures to prevent, or at least reduce, emissions from these activities into the atmosphere, water and soil, including waste, in order to achieve a high level of protection of the environment considered as a whole.

In order to make integrated pollution prevention and control effective, European legislation made the start-up of installations falling within its scope subject to obtaining a written permit, which must be granted in a coordinated manner when several competent authorities are involved in the procedure. This permit establishes the environmental conditions required for the operation of the installations and, among other aspects, specifies the emission limit values for polluting substances, which will be based on the best available techniques and taking into consideration the technical characteristics of the installation, its geographical location and the local environmental conditions. For these purposes, and to facilitate the application of the above measures, the Directive established a system for the exchange of information between the European Commission and the Member States on the main polluting emissions and the sources responsible for them, as well as on the best available techniques.

Prtr-spain

To grant, if appropriate, by resolution the modification of the integrated environmental authorization under the terms set forth in Royal Legislative Decree 1/2016, of December 16, which approves the revised text of the Law on integrated pollution prevention and control and Royal Decree 815/2013, of October 18, which approves the Regulation of industrial emissions and development of Law 16/2002, of July 1, on integrated pollution prevention and control.

In order to be considered a non-substantial modification, none of the criteria established in Article 14 of Royal Decree 815/2013, of October 18, approving the Regulation on industrial emissions and development of Law 16/2002, of July 1, on integrated pollution prevention and control, must be met.

Once the application is assessed, a procedure is initiated that concludes with a resolution, if applicable, for the modification of the integrated environmental authorization, in accordance with the provisions of Royal Legislative Decree 1/2016, of December 16, which approves the revised text of the Law on integrated pollution prevention and control and Royal Decree 815/2013, of October 18, which approves the Regulation of industrial emissions and development of Law 16/2002, of July 1.

Industrial emissions directive

Annually, the owners of the facilities affected by the Integrated Pollution Prevention and Control regulations (RDL 1/2016) shall communicate to the body granting the Environmental Authorization the information referred to Article 22.1.i of Royal Legislative Decree 1/2016, of December 16 (repealing Law 16/2002, of July 1), which approves the revised text of the Integrated Pollution Prevention and Control Law.

This information can be submitted, within the deadlines, through a new screen of the PRTR-CAT application that allows registered users to comply with this new regulatory requirement in a simplified manner. Since January 2016, this communication can be accessed and made through the PRTR-CAT application.

Ley 37 2003

Soluciones de cirugía guiada de implantesDurante casi 20 años, los profesionales de los implantes de Russellville Dental Lab han trabajado con profesionales dentales de costa a costa en casos de cirugía guiada.    Hemos puesto esa experiencia a su servicio desarrollando flujos de trabajo que permiten una entrega rápida y consistente de soluciones de cirugía guiada de implantes dentales para una variedad de sistemas de implantes dentales como Nobel Biocare, Straumann, Biohorizon y otros.

Si está buscando una solución para un sistema específico que no ve en la lista, no se preocupe.    Somos compatibles con cientos de plataformas de implantes y disponemos de kits de cirugía guiada.    Sólo tiene que ponerse en contacto con nosotros para obtener más información.

ARC Aligners – Clear AlignersLee Coursey2021-09-22T10:21:40-05:00Ortodoncia| Ahora disponible exclusivamente en Russellville Dental Lab, ARC Aligners presenta una nueva y rentable solución de Clear Aligners para sus pacientes sin costes iniciales, sin contratos y sin complicaciones. Los ARC Aligners pueden ayudar Leer más

ContourZ Full Contour ZirconiaLee Coursey2020-05-26T15:18:37-05:00Corona y Puente|RDL reúne a los mejores fabricantes de zirconia junto con más de 50 años de conocimiento de coronas y puentes para hacer la línea ContourZ.Leer más